System Integration & Control Systems Design


Introduction to 'loop problem signatures' series

September 2000 System Integration & Control Systems Design

In response to the frequent requests for more detailed information on control loop problem solving, I intend publishing some of the information dealt with in our courses in the next series of articles. Initially the articles will only deal with some of the basics concerning problems and faults commonly encountered in feedback control loops. They will be published under the general heading of 'loop problem signatures'.

It should be noted that many of the things that will appear in this new series of articles may have appeared and been discussed in previous articles dealing with miscellaneous loops in various plants. The approach here will be to systematically, and sequentially categorise the problems in a more logical manner. Michael Brown Control Engineering is planning to put up an Internet website, hopefully within the next few months and intends placing these articles on the site as they are produced.

To kick off the series and to avoid having to redefine terminology every time an article appears, I will deal with some very basic fundamentals about the feedback loop in this article and also establish the terminology and names that will be used throughout the series. It is therefore suggested that it would be a good idea to keep this for future reference.

At the outset it should be noted that there are no universal standards and definitions when it comes to industrial instrumentation and control. The industry has been and will be largely led by the large manufacturers who generally use their own terminology and definitions. In fact many of them do publish the definitions of all the terms they use in their specifications. Thus it is really important that users are aware of this as one manufacturer may have a different definition of a common term (such as the term 'accuracy' for example), to another manufacturer. It is really a case of 'let the buyer beware'.

You will therefore appreciate that the terms and names that will be used in these articles may and most probably will not be the same as those used by your instrument manufacturer or those that you yourself are familiar with.

Figure 1. Feedback control loop
Figure 1. Feedback control loop

Figure 1 shows a simple feedback control loop. The loop consists of:

* A measuring device (with associated transmitter that converts the signal to a 4 to 20 mA or digital signal which is suitable for transmission back to the control room).

* A final control element which is often simply called the 'valve', even though in actuality it could be any one of a numerous range of devices including dampers, variable speed drives typically powering pumps, fans or belts, louvres, governors, heating appliances or actual control valves. Although not shown in the figure, the final control element may and often does, include a current-to-pneumatic (I/P) converter and a valve positioner.

* A controller.

* Finally the process itself forms an integral and important component of the loop.

From the control point of view, however, the process consists of everything external to the controller including the measuring device, transmitter, valve, piping etc. This is shown in Figure 1 as the 'process boundary'.

The signal from the transmitter to the controller will be referred to as 'the process variable' (PV) and the signal from the controller to the final control element as 'the process demand' (PD). It should be noted that the PV which is one of the input signals to the controller is representing what is happening on the output of the process whilst the PD which is the output signal from the controller, represents what is happening on the input to the process. This sometimes confuses people but it will be clearer if you realise that the controller is effectively in parallel with the process.

The controller itself in its simplest form has two inputs. One is called 'the setpoint' (SP) which is the value at which you would like to control the process and the other is the PV which is the actual value of the process. The controller's operation will be discussed in detail in a future series of articles. However, for the present it is important to know that as a general rule, the first thing that a controller does is to subtract the one signal from the other (eg 'SP-PV'). This difference will be called 'the error'.

If a process is on setpoint and is stable and an error then arises, it will be because either the setpoint or else the PV has changed. The former is referred to as a 'setpoint change' and the latter as a 'load change'. Load changes are normally caused by external changes that affect the process.

Again in very general terms, in most control loops the purpose of the controller is to try to keep the error to a minimum. Therefore the best method of being able to determine the effectiveness of the control loop is to calculate the error over a period of time. This will be referred to as 'control variance'. In reality there are many ways of calculating control variance. For example one could integrate the error over a period of time, for example one 8ÿh shift. However, probably the most commonly used modern method is the use of statistical calculations. The error is sampled at regular intervals (commonly at the controller scan rate). The samples thus obtained are then statistically analysed at longer intervals. The statistical standard deviation gives a good representation of the variance and is a practice commonly employed in paper manufacturing. In the paper industry '2 x standard deviation' (commonly referred to as '2 x sigma'), is used as a measure of the effectiveness of the moisture and basis weight controls on each roll of paper.

When operators make changes during manual operation they adjust the PD directly, as can be seen in Figure 2.

Figure 2
Figure 2

When functioning automatically the controller measures the error signal, solves a mathematical equation and the result of the calculation sets the magnitude of the PD signal. The valve then moves to the position as dictated by the PD which adjusts the amount of whatever is going into the process. The process then reacts accordingly which will in turn change the value of the PV. This changes the error and the controller will then recalculate the PD and so on. Thus this sequence is effectively going on round and round the loop on a regular basis (depending on how often the controller does its calculation which on most modern controllers is once a second).

Figure 3
Figure 3

As can be seen in Figure 3: if the control system works efficiently, it would be far easier for the operator to set the desired value on the setpoint on the controller, leaving the controller to perform the work of getting the PV to the right value and keeping it there. This would be far better than having the human operator perform the task manually.

Unfortunately an almost complete lack of training (and hence understanding), of the field of truly practical control has resulted in the vast majority of control loops being so badly set up that operators frequently make more changes manually than are made automatically. Operators tend to leave controllers in automatic only when the plant is running under steady state conditions where, of course. the controllers are generally doing very little. (Control in automatic is often referred to as 'closed loop control', and in manual as 'open loop control'.)

It should be noted that to effectively optimise control loops one must use (at the very least), a high-speed, high-resolution, multichannel recorder. A proper loop analyser like the Protuner which is specifically designed for optimisation work, makes the task much easier. It should be noted that the 'tools' provided on control equipment like DCS and scada systems are generally completely inadequate for optimisation, particularly for fast processes. The recorder or analyser, is connected to the process across the controller's input and output (PV and PD signals). Most tests are performed by making changes on the controller either in automatic (closed loop tests) or in manual (open loop tests).

The next article will deal with the two 'classes of processes' which is essential to an understanding of practical process control.

Over the years I have had many requests to either write a book or give more detailed written explanations for some of the problems we have encountered in our work on practical loop optimisation. I am by nature and inclination an engineer and not a writer and have shied away from such a formidable task. I have been informed that the book would cost more to produce than it would earn as there is a relatively small market for such a work. I also believe that people learn far more and even more importantly, would gain much better understanding of the subject by actually attending our courses where things are demonstrated by practising exercises on a powerful simulation package, rather than trying to read it up in a book. However, some of the past delegates did not have the time and/or opportunity to practice what they had learned in their plants and soon forgot much of the course and many of them have also requested me to put out a book. Hence this series of articles.

Michael Brown is a specialist in control loop optimisation with many years of experience in process control instrumentation. His main activities are consulting and teaching practical control loop analysis and optimisation. He gives training courses that can be held in clients' plants where students can have the added benefit of practising on live loops. His work takes him to plants all over South Africa and also to other countries.



Credit(s)



Share this article:
Share via emailShare via LinkedInPrint this page

Further reading:

Turning system integrators into trusted technology partners
Schneider Electric South Africa IT in Manufacturing System Integration & Control Systems Design
Schneider Electric’s Alliance Partner Programme is repositioning system integrators from hardware suppliers into lifecycle-value partners. Oriel Soupen explains the competency framework, certification model and real-world results that are already helping African system integrators win higher-value, longer-term engagements.

Read more...
When digital twins move from concept to critical tool
IT in Manufacturing System Integration & Control Systems Design Maintenance, Test & Measurement, Calibration
Digital twins are moving out of the lab and onto the mine, the factory floor and the transport network where they predict failures before they happen. Amritesh Anand looks at where they earn their keep, the data and integration work behind them, and the security questions every organisation should ask before switching one on.

Read more...
Best practices for managing the MRO supply chain in Africa
RS South Africa System Integration & Control Systems Design
RS South Africa outlines how strong data governance and digital tools can turn maintenance, repair and operations procurement into a strategic advantage across Africa.

Read more...
Loop signature Part 2-5: Interactive control systems
Michael Brown Control Engineering Fieldbus & Industrial Networking
Feedforward control was explained in the previous loop signature articles. One of the examples used was feedforward control of load changes on a heat exchanger when variations occurred in the flow of the process fluid through the exchanger.

Read more...
Containerised Solar Solution Accelerates Delivery of Riverside 3 MW Power Plant
Proconics System Integration & Control Systems Design
Proconics was engaged by NewFields to deliver the electrical integration solution for the Riverside 3 MW Solar Power Plant in Zimbabwe. The project required a compact, modular approach that could simplify deployment, minimise site works, and support rapid commissioning in a remote location.

Read more...
Modern Energy Metering Solution Enhances Reliability and Reporting for Major Power Utility
SAM Systems Automation & Management System Integration & Control Systems Design
This project involved the implementation of a modern energy metering system for a major power utility operating within the industrial automation and energy management sector. The objective was to improve the reliability, accessibility, and accuracy of energy data while simplifying infrastructure and reducing system complexity.

Read more...
Loop signature Part 2-4: Feedforward Control: Part 3
Michael Brown Control Engineering Editor's Choice Fieldbus & Industrial Networking
In the previous articles in this series, the basic theory behind feedforward control was discussed, and it was also shown how to apply feedforward in practice. In this article, it will be shown how well feedforward can work in practice by giving a couple of examples.

Read more...
Loop signature Part 2-3: Feedforward Control: Part 2
Michael Brown Control Engineering Editor's Choice Fieldbus & Industrial Networking
Feedforward control tuning is not nearly as critical as feedback tuning, and fairly simple models are usually fine for the purpose in hand.

Read more...
PCS Global
PCS Global System Integration & Control Systems Design
PCS Global led a digital infrastructure initiative in a southern African data centre setting, aiming to merge several essential operational systems into one cohesive platform. The objective was to break down silos, enable real-time decisions, and ensure seamless operation in a mission-critical environment.

Read more...
Seamless migration from ET 200M to ET 200SP HA for future-ready automation
Moore Process Controls System Integration & Control Systems Design
Moore Process Controls undertook a modernisation initiative spanning the mining, petrochemical, and oil & gas sectors. This project involved upgrading legacy Siemens ET200M I/O systems to the advanced ET200SP HA platform.

Read more...









While every effort has been made to ensure the accuracy of the information contained herein, the publisher and its agents cannot be held responsible for any errors contained, or any loss incurred as a result. Articles published do not necessarily reflect the views of the publishers. The editor reserves the right to alter or cut copy. Articles submitted are deemed to have been cleared for publication. Advertisements and company contact details are published as provided by the advertiser. Technews Publishing (Pty) Ltd cannot be held responsible for the accuracy or veracity of supplied material.




© Technews Publishing (Pty) Ltd | All Rights Reserved