System Integration & Control Systems Design


Introduction to 'loop problem signatures' series

September 2000 System Integration & Control Systems Design

In response to the frequent requests for more detailed information on control loop problem solving, I intend publishing some of the information dealt with in our courses in the next series of articles. Initially the articles will only deal with some of the basics concerning problems and faults commonly encountered in feedback control loops. They will be published under the general heading of 'loop problem signatures'.

It should be noted that many of the things that will appear in this new series of articles may have appeared and been discussed in previous articles dealing with miscellaneous loops in various plants. The approach here will be to systematically, and sequentially categorise the problems in a more logical manner. Michael Brown Control Engineering is planning to put up an Internet website, hopefully within the next few months and intends placing these articles on the site as they are produced.

To kick off the series and to avoid having to redefine terminology every time an article appears, I will deal with some very basic fundamentals about the feedback loop in this article and also establish the terminology and names that will be used throughout the series. It is therefore suggested that it would be a good idea to keep this for future reference.

At the outset it should be noted that there are no universal standards and definitions when it comes to industrial instrumentation and control. The industry has been and will be largely led by the large manufacturers who generally use their own terminology and definitions. In fact many of them do publish the definitions of all the terms they use in their specifications. Thus it is really important that users are aware of this as one manufacturer may have a different definition of a common term (such as the term 'accuracy' for example), to another manufacturer. It is really a case of 'let the buyer beware'.

You will therefore appreciate that the terms and names that will be used in these articles may and most probably will not be the same as those used by your instrument manufacturer or those that you yourself are familiar with.

Figure 1. Feedback control loop
Figure 1. Feedback control loop

Figure 1 shows a simple feedback control loop. The loop consists of:

* A measuring device (with associated transmitter that converts the signal to a 4 to 20 mA or digital signal which is suitable for transmission back to the control room).

* A final control element which is often simply called the 'valve', even though in actuality it could be any one of a numerous range of devices including dampers, variable speed drives typically powering pumps, fans or belts, louvres, governors, heating appliances or actual control valves. Although not shown in the figure, the final control element may and often does, include a current-to-pneumatic (I/P) converter and a valve positioner.

* A controller.

* Finally the process itself forms an integral and important component of the loop.

From the control point of view, however, the process consists of everything external to the controller including the measuring device, transmitter, valve, piping etc. This is shown in Figure 1 as the 'process boundary'.

The signal from the transmitter to the controller will be referred to as 'the process variable' (PV) and the signal from the controller to the final control element as 'the process demand' (PD). It should be noted that the PV which is one of the input signals to the controller is representing what is happening on the output of the process whilst the PD which is the output signal from the controller, represents what is happening on the input to the process. This sometimes confuses people but it will be clearer if you realise that the controller is effectively in parallel with the process.

The controller itself in its simplest form has two inputs. One is called 'the setpoint' (SP) which is the value at which you would like to control the process and the other is the PV which is the actual value of the process. The controller's operation will be discussed in detail in a future series of articles. However, for the present it is important to know that as a general rule, the first thing that a controller does is to subtract the one signal from the other (eg 'SP-PV'). This difference will be called 'the error'.

If a process is on setpoint and is stable and an error then arises, it will be because either the setpoint or else the PV has changed. The former is referred to as a 'setpoint change' and the latter as a 'load change'. Load changes are normally caused by external changes that affect the process.

Again in very general terms, in most control loops the purpose of the controller is to try to keep the error to a minimum. Therefore the best method of being able to determine the effectiveness of the control loop is to calculate the error over a period of time. This will be referred to as 'control variance'. In reality there are many ways of calculating control variance. For example one could integrate the error over a period of time, for example one 8ÿh shift. However, probably the most commonly used modern method is the use of statistical calculations. The error is sampled at regular intervals (commonly at the controller scan rate). The samples thus obtained are then statistically analysed at longer intervals. The statistical standard deviation gives a good representation of the variance and is a practice commonly employed in paper manufacturing. In the paper industry '2 x standard deviation' (commonly referred to as '2 x sigma'), is used as a measure of the effectiveness of the moisture and basis weight controls on each roll of paper.

When operators make changes during manual operation they adjust the PD directly, as can be seen in Figure 2.

Figure 2
Figure 2

When functioning automatically the controller measures the error signal, solves a mathematical equation and the result of the calculation sets the magnitude of the PD signal. The valve then moves to the position as dictated by the PD which adjusts the amount of whatever is going into the process. The process then reacts accordingly which will in turn change the value of the PV. This changes the error and the controller will then recalculate the PD and so on. Thus this sequence is effectively going on round and round the loop on a regular basis (depending on how often the controller does its calculation which on most modern controllers is once a second).

Figure 3
Figure 3

As can be seen in Figure 3: if the control system works efficiently, it would be far easier for the operator to set the desired value on the setpoint on the controller, leaving the controller to perform the work of getting the PV to the right value and keeping it there. This would be far better than having the human operator perform the task manually.

Unfortunately an almost complete lack of training (and hence understanding), of the field of truly practical control has resulted in the vast majority of control loops being so badly set up that operators frequently make more changes manually than are made automatically. Operators tend to leave controllers in automatic only when the plant is running under steady state conditions where, of course. the controllers are generally doing very little. (Control in automatic is often referred to as 'closed loop control', and in manual as 'open loop control'.)

It should be noted that to effectively optimise control loops one must use (at the very least), a high-speed, high-resolution, multichannel recorder. A proper loop analyser like the Protuner which is specifically designed for optimisation work, makes the task much easier. It should be noted that the 'tools' provided on control equipment like DCS and scada systems are generally completely inadequate for optimisation, particularly for fast processes. The recorder or analyser, is connected to the process across the controller's input and output (PV and PD signals). Most tests are performed by making changes on the controller either in automatic (closed loop tests) or in manual (open loop tests).

The next article will deal with the two 'classes of processes' which is essential to an understanding of practical process control.

Over the years I have had many requests to either write a book or give more detailed written explanations for some of the problems we have encountered in our work on practical loop optimisation. I am by nature and inclination an engineer and not a writer and have shied away from such a formidable task. I have been informed that the book would cost more to produce than it would earn as there is a relatively small market for such a work. I also believe that people learn far more and even more importantly, would gain much better understanding of the subject by actually attending our courses where things are demonstrated by practising exercises on a powerful simulation package, rather than trying to read it up in a book. However, some of the past delegates did not have the time and/or opportunity to practice what they had learned in their plants and soon forgot much of the course and many of them have also requested me to put out a book. Hence this series of articles.

Michael Brown is a specialist in control loop optimisation with many years of experience in process control instrumentation. His main activities are consulting and teaching practical control loop analysis and optimisation. He gives training courses that can be held in clients' plants where students can have the added benefit of practising on live loops. His work takes him to plants all over South Africa and also to other countries.



Credit(s)



Share this article:
Share via emailShare via LinkedInPrint this page

Further reading:

Containerised Electrical & Control System Powers Paste Plant in Botswana
System Integration & Control Systems Design
Delivering a complete, containerized solution for a mine’s paste plant in Botswana, this project stands as a model of modern EC&I execution — integrating electrical, control, and automation systems into ...

Read more...
Loop Signature 30: Nonlinearity in control loops (Part 1)
Michael Brown Control Engineering Editor's Choice Fieldbus & Industrial Networking
If nonlinearity occurs it means that if one is to carry on controlling with the same response to changes in load or setpoint, then the tuning of the controller will also need to be adjusted to meet the new conditions.

Read more...
Control system upgrade: Smelting
SAM Systems Automation & Management System Integration & Control Systems Design
Systems Automation & Management recently completed a major control system upgrade in the smelting industry. The project was delivered on budget and achieved a positive ROI for the client.

Read more...
Gottwald drives upgrade: Ports and harbours
Abacus Automation System Integration & Control Systems Design
In the ports and harbours sector, Abacus Automation completed a significant modernisation of a Gottwald crane, improving both operational reliability and serviceability.

Read more...
Mining industry upgrade: From ageing systems to maximum capacity
System Integration & Control Systems Design
Iritron recently undertook a major upgrade in the mining sector, focusing on washing and screening plants, jigs, thickeners, tailings, water systems, conveyors and reclaimers.

Read more...
Agogo Integrated West Hub Project: FPSO/subsea offshore Angola
Moore Process Controls System Integration & Control Systems Design
The Agogo Integrated West Hub project represents a historic milestone in the FPSO and subsea industry, achieving first oil offshore of Angola. This project is the first FPSO deployment since ANPG’s establishment in 2019, and the first major project for Azule Energy since 2022.

Read more...
Integrated Robotics and Control Systems Deliver 45% Production Boost at Aquazania Waters Project and Industry
Process Dynamics System Integration & Control Systems Design
Project and Industry    Process Dynamics designed and commissioned a state-of-the-art Reverse Osmosis (RO) water purification and automated bottle filling plant for Aquazania Waters in Linbro Park, Johannesburg. ...

Read more...
Case History 199: Another example of the effectiveness of cascade control
Michael Brown Control Engineering Editor's Choice Fieldbus & Industrial Networking
In my last article I wrote about how cascade control systems can effectively overcome valve problems. This article gives another example of how a temperature control was able to perform well, in spite of really severe valve problems.

Read more...
Digital transformation from the edge
DirectLogic Automation System Integration & Control Systems Design
Edge-enabled PLCs are an accessible and affordable way for most users to collect and create value from use field-sourced data.

Read more...
Powering southern Africa’s industrial evolution for over five decades
Oilpower System Integration & Control Systems Design
Established in 1974, Oilpower is a recognised name in South Africa’s hydraulic and pneumatic sector. What started as a small, family-run business has matured into a highly structured operation with specialised teams, experienced engineers and a reputation for technical excellence and reliability. Oilpower is celebrating its 50th anniversary this year

Read more...









While every effort has been made to ensure the accuracy of the information contained herein, the publisher and its agents cannot be held responsible for any errors contained, or any loss incurred as a result. Articles published do not necessarily reflect the views of the publishers. The editor reserves the right to alter or cut copy. Articles submitted are deemed to have been cleared for publication. Advertisements and company contact details are published as provided by the advertiser. Technews Publishing (Pty) Ltd cannot be held responsible for the accuracy or veracity of supplied material.




© Technews Publishing (Pty) Ltd | All Rights Reserved