Motion Control & Drives


Transporting substations for the world’s largest offshore wind farm

I&C February 2026 Motion Control & Drives

Dogger Bank Wind Farm will be the world’s largest offshore wind farm when it is completed. Located off the northeast coast of England in the North Sea, it will have an installed capacity of 3,6 GW and power around six million homes annually. Mammoet was involved in providing transportation and weighing of the project’s three offshore substations.

The substations are critical components, collecting and converting the power from the transformers and sending the electricity ashore to power homes. They were constructed in stages at two different locations in Thailand and Norway. With fabrication split between two yards in different parts of the world, and a specialist vessel chartered to move the substations, careful planning and management of personnel and equipment was needed to ensure everything ran to schedule.

Hundreds of axle lines in two places

Mammoet assisted with the three execution phases of each substation: the load-out in Thailand, the load-in in Norway, and the final weighing and load-out for transport to the North Sea. The biggest challenge was sourcing the large number of self-propelled modular transporters (SPMTs) required to perform the three phases across two locations.

In Thailand, Mammoet provided 338 axle lines to move the 7500 ton structures. In addition, a further 344 were needed in Norway – 264 for the load-in, plus a further 80 for the substations’ weighing and second load-outs to accommodate their final weight of 9350 tons.

This brought the total number of axle lines used for the project to 682, which were sourced from Mammoet’s global fleet of over 5000, and delivered on container vessels and via land transport.

A variety of tidal, engineering and logistical challenges needed to be overcome to facilitate their load-out and load-in operations. Following precise configuration, SPMTs lifted the substations using their onboard stroke, following which they were transferred to or from oceangoing vessels.

Jacking was made even smoother through the fabrication of special grillage beams for the SPMTs. These allowed the loads from the SPMT trailers to be transferred to the strongest points of the topside. Two bespoke load-out frames ensured the substations stayed firmly in position when transported on the SPMTs. The first of these travelled with the Dogger Bank A substation from Thailand to Norway, remaining there not only for that load-in, but also its load-out, and the load ins and load outs of the Dogger Bank substations.

In Thailand, the substations had to be driven a kilometre over public roads to reach the port. Fences had to be removed and a temporary gravel slope constructed so that the SPMTs could avoid using the main entrance. Once inside the terminal, the substations were transported via SPMT onto a heavy load carrier using RoRo ramps. The SPMTs lowered the modules onto the vessel’s grillages before disembarking with the interface beams and the load-out frame.

It took 45 to 50 days for each substation to travel from Thailand to Norway. Due to the allowable ground-bearing pressure being higher in Norway, fewer axle lines of SPMT were needed for the load-in operation. The substations were driven off the vessel and taken to a yard near the quayside. There, they were placed onto temporary supports for the final fabrication work to take place. Once each substation was completed, a total of 36 weighing jacks and loadcells performed a weighing operation. This process was repeated three times to get an average measurement and determine the final weight and COG.

For the final load-out operation, 344 axle lines of SPMT were used to accommodate the additional weight of the now-installed electrical transformer equipment. Mammoet supported with the ballasting of the barge. A total of 16 submersible ballast pumps, each with a capacity of 1000 cubic metres per hour, were used to pump water in and out of the barge to keep it level during load transfer.

The fleet and flexibility to deliver

“One of the things Mammoet does so well is to be flexible,” said Dorien Frequin, branch manager Norway at Mammoet. “We help our clients whenever there are small changes to their plans, and our teams work together to adapt to these changes. Our engineering department works closely with our project managers, who work closely with our planning team to source the equipment needed, and that can all happen in a very short timeframe. From sourcing hundreds of axle lines of SPMTs from multiple global locations to working closely with Aibel to refine the three execution phases, meticulous planning and effective communication were essential to the success of this project.”

For more information contact Mammoet Global, +31 622 63 5062, david.leon.shaw@mammoet.com, www.mammoet.com




Share this article:
Share via emailShare via LinkedInPrint this page

Further reading:

Mammoet completes major bridge replacement at Amsterdam Centraal Station
Motion Control & Drives
Mammoet completes the second of five major bridge replacements at Amsterdam Centraal Station, transporting steel deck sections by water to keep the station open throughout the works.

Read more...
ndustry expertise drives SEW-EURODRIVE’s Electra Mining Africa presence
Motion Control & Drives
SEW-EURODRIVE will showcase industry-specific drive technology, modernisation services and expanded aftermarket support at Electra Mining Africa 2026, with a focus on lifecycle support and operational optimisation.

Read more...
Next-generation motor management solution
Schneider Electric South Africa Motion Control & Drives
Schneider Electric has launched its TeSys Tera motor management solution in the West African market, combining advanced motor protection, digital connectivity and real-time diagnostics for manufacturing, mining and water applications.

Read more...
Premium slewing rings from SKF
SKF South Africa Motion Control & Drives
SKF’s slewing bearing portfolio spans standard and customised designs across a wide range of types and sizes, backed by advanced monitoring, remanufacturing services and application engineering expertise for demanding industrial applications.

Read more...
World’s first fully electric hydrogen fuel cell aircraft engine
Motion Control & Drives
Airbus and MTU Aero Engines are establishing a joint venture to industrialise hydrogen-electric propulsion systems for commercial aviation, combining liquid hydrogen expertise with fuel cell development to support the ZEROe programme’s 2035 target.

Read more...
Monopile handling innovations boost offshore wind farm
Motion Control & Drives
Mammoet’s XXL monopile transport system and new MTC 1600 terminal crane are helping offshore wind developers safely marshal and install ever larger monopile foundations, as demonstrated on Van Oord’s Baltic Power project.

Read more...
Automation without the mega factory
Yaskawa Southern Africa Motion Control & Drives
Mid-sized South African manufacturers are turning to targeted, low-risk automation to solve specific bottlenecks rather than chasing full factory transformation, helped by retrofit-friendly robotics and advanced simulation software.

Read more...
Duplex worm gears for precision backlash adjustment
Motion Control & Drives
KHK USA has introduced duplex worm gears that allow precise backlash adjustment through simple axial movement of the worm shaft, eliminating the need for gearbox housing alterations during assembly or maintenance.

Read more...
Choosing the right level of protection in modern automation
Motion Control & Drives
Choosing the right ingress protection rating for a motor or drive is less about maximising the number, and more about understanding what the machine will actually face in operation.

Read more...
Osterwalder launches multi-plate, fully electric powder press
Motion Control & Drives
Osterwalder Technology has launched the MPneo 480, a 480 kN fully electric multi-plate powder press with up to six cross-pressing modules. Designed for hard metals, ceramics and advanced engineered materials, the press supports complex geometries and offers optional

Read more...









While every effort has been made to ensure the accuracy of the information contained herein, the publisher and its agents cannot be held responsible for any errors contained, or any loss incurred as a result. Articles published do not necessarily reflect the views of the publishers. The editor reserves the right to alter or cut copy. Articles submitted are deemed to have been cleared for publication. Advertisements and company contact details are published as provided by the advertiser. Technews Publishing (Pty) Ltd cannot be held responsible for the accuracy or veracity of supplied material.




© Technews Publishing (Pty) Ltd | All Rights Reserved