System Integration & Control Systems Design


Containerised Solar Solution Accelerates Delivery of Riverside 3 MW Power Plant

June 2026 System Integration & Control Systems Design

Project & Industry

Proconics was engaged by NewFields to deliver the electrical integration solution for the Riverside 3 MW Solar Power Plant in Zimbabwe. The project required a compact, modular approach that could simplify deployment, minimise site works, and support rapid commissioning in a remote location.

Project Outcome

The project successfully delivered a fully integrated, containerised solar power solution that streamlined installation and reduced project complexity.

Key benefits included:

• Reduced civil construction requirements

• Simplified transportation and deployment

• Faster commissioning through preconfigured assemblies

• Improved maintainability through equipment consolidation

• Reliable power generation supported by a balanced redundancy strategy

The result is a robust solar generation facility designed to maximise uptime while maintaining operational simplicity.

Biggest Challenge

The project presented several challenges:

Remote Electrical Integration

A complete electrical design was required from the solar modules through to the 33 kV switchgear in a remote operating environment.

Equipment Consolidation

The client required a compact solution that reduced site infrastructure requirements while remaining easy to install and maintain.

Rapid Commissioning

Aggressive project timelines demanded a plug-and-play approach that would minimise on-site assembly and testing.

Our Solution

Proconics developed a containerised, centralised inverter solution that integrated key electrical equipment into factory-assembled units.

The solution included:

• Centralised string inverters

• Low-voltage (LV) switchgear

• Medium-voltage (MV) switchgear

• Transformers 

• Integrated monitoring systems

By delivering preconfigured, plug-and-play assemblies, the team significantly reduced on-site installation requirements and accelerated commissioning activities.

The design also balanced redundancy with simplicity, ensuring reliable power production while avoiding unnecessary system complexity.

Key Technologies & Tools Used

• Centralised string inverter technology

• Containerised power conversion systems

• LV and MV switchgear 

• Integrated transformers 

• Plant monitoring and performance systems

• 33 kV grid integration 

Unique Selling Point

Proconics delivers fully integrated, containerised power solutions that combine rapid deployment, reduced site complexity, and dependable long-term performance in challenging environments.

Project Highlights

• 3 MW solar power plant 

• Containerised, plug-and-play design

• Full integration from PV field to 33 kV connection

• Accelerated commissioning 

• Reduced civil works and installation footprint

• Optimised balance between redundancy and simplicity


Credit(s)



Share this article:
Share via emailShare via LinkedInPrint this page

Further reading:

Modern Energy Metering Solution Enhances Reliability and Reporting for Major Power Utility
SAM Systems Automation & Management System Integration & Control Systems Design
Project & Industry This project involved the implementation of a modern energy metering system for a major power utility operating within the industrial automation and energy management sector. The objective ...

Read more...
PCS Global
PCS Global System Integration & Control Systems Design
Project and industry: PCS Global led a digital infrastructure initiative in a southern African data centre setting, aiming to merge several essential operational systems into one cohesive platform. ...

Read more...
Seamless migration from ET 200M to ET 200SP HA for future-ready automation
Moore Process Controls System Integration & Control Systems Design
Project and industry: Moore Process Controls undertook a modernisation initiative spanning the mining, petrochemical, and oil & gas sectors. This project involved upgrading legacy Siemens ET200M I/O ...

Read more...
Proconics Modernises Refinery Tank Automation with Compliance-Focused, Brownfield Upgrades
Proconics System Integration & Control Systems Design
Project & Industry Proconics was engaged to modernise automation and SCADA systems across a refinery tank farm. The project involved complex brownfield integration, aligning new automation with existing ...

Read more...
Project & Industry
System Integration & Control Systems Design
Project: Upgrading essential automation and SCADA systems at a coal mine.    Outcome: A modern, stable automation and SCADA environment with reduced technical debt and easier support, ready for expansion. ...

Read more...
Major digital transformation project for Isuzu Motors
System Integration & Control Systems Design
Isuzu Motors South Africa, in partnership with NoMuda and S4 Integration, has kicked off a major two-year digital transformation project to modernise its production environment.

Read more...
Modernising Vertical Filter Press Machines with Future-Focused Control Systems
Scibotron System Integration & Control Systems Design
Project and Industry Pressure Filter Specialists approached us to modernise vertical filter press machines for the Minerals and Metals industry. The goal was to improve reliability, reduce downtime, ...

Read more...
Project & industry
Abacus Automation System Integration & Control Systems Design
Project and Industry This project involved delivering a complete electrical, instrumentation, and automation solution for a new OEM drum-twister machine, replacing an ageing unit in a major cabling production ...

Read more...
It’s a risky business not to challenge standard language
System Integration & Control Systems Design
On the surface, contracts all look alike. Once you’ve seen one, you’ve seen them all, or so it seems. Maybe so, but hidden within the standard language can be language that shifts the other party’s risk to you.

Read more...
Containerised Electrical & Control System Powers Paste Plant in Botswana
PCS Global System Integration & Control Systems Design
Delivering a complete, containerized solution for a mine’s paste plant in Botswana, this project stands as a model of modern EC&I execution — integrating electrical, control, and automation systems into ...

Read more...









While every effort has been made to ensure the accuracy of the information contained herein, the publisher and its agents cannot be held responsible for any errors contained, or any loss incurred as a result. Articles published do not necessarily reflect the views of the publishers. The editor reserves the right to alter or cut copy. Articles submitted are deemed to have been cleared for publication. Advertisements and company contact details are published as provided by the advertiser. Technews Publishing (Pty) Ltd cannot be held responsible for the accuracy or veracity of supplied material.




© Technews Publishing (Pty) Ltd | All Rights Reserved