SCADA/HMI


Meeting potable water demands

April 2009 SCADA/HMI

Water is a much talked about and scarce resource. There are many reports of the problems faced by a strained infrastructure, as well as the social demand for a quality of supply that ensures a better life for all. These challenges are real and without the application of automation and control systems the chances of meeting those demands will remain and become ever more difficult.

The supply chain of water

Purification

From sources such as rivers, dams and boreholes untreated water is fed into a bulk water purification plant. This water is put through a set of processes, dosed with chemicals and passed to the next phase.

Distribution

The purified water is then pumped to various holding reservoirs from where it is fed to the consumer through a network of pipes. The water is then consumed and a fairly high percentage is returned to the system as grey water ie, sewage and waste water. The grey water is then treated and returned to the natural water systems and the cycle starts again.

Waste water treatment

Scada and automation in various forms are critical to ensure that these complicated interconnected systems remain balanced and controlled throughout the supply chain. A problem compounded by the fact that different suppliers manage different parts of the supply chain.

An example is in Johannesburg where Rand Water is the bulk purifier. Johannesburg Water and other municipalities effectively purchase bulk water and own the distribution network and usually the waste water treatment part of this cycle.

At the bulk purification side it is necessary to have telemetry systems feeding data into a management system in order to understand the availability and quality of supply to meet the demand for clean water. Dam levels, rainfall, pump station status are just a few of the parameters that are important to support decisions and ensure constant and sufficient raw water.

PLCs ensure local control and protection of equipment such as pumps and valves, with the alarm signals being transmitted via the telemetry system. The challenges faced by telemetry system suppliers is often one of terrain, geographical distance between sites requires proper design of the radio or other telecommunication networks to ensure the integrity of the data being supplied to a scada system in a central control room.

One of the biggest challenges faced by the operators is the need to trust the signals the scada is showing, as they often have no realtime video of the site to back up the decisions they make. (There is a well known incident where the signal for the high level in a reservoir in Johannesburg was indicating a false reading and the operator, believing the reservoir to be empty, initiated pumping and caused an overflow which flooded a pump station causing millions of rands of damage). So, some operators still do not allow control of the system but simply use the scada as a tool and will still manually dispatch someone to drive to a pump station where they can physically see the status of the plant before initiating a pump start or even open a valve.

That said, the advent of broadband and IP networks is making it possible to install cameras on site in order to allow a central control room to verify the status and have the confidence to initiate some control action.

At the larger manned water treatment works it is back to conventional PLC and scada control with hardwired connectivity for communications making the systems extremely reliable.

The use of standard interfaces such as OPC as well as open PC-based scada allow users to leverage the mobile technologies and improve reliability and response times by being able to SMS alarm conditions to mobile technicians. The ability to transfer status signals between suppliers is also critical. Umgeni Water and eThekwini Metro are currently implementing a shared information solution which allows each to monitor the interface between their two systems. This will ensure a more reliable, safe and effective transfer of water to the people of Durban, which previously relied on phone calls to get supply initiated. For example Umgeni Water cannot start a transfer of water to the Metro unless the valves at the receiving system were open. This used to result in lengthy delays while the necessary communications between personnel took place, now the status of the valves can be seen by both parties enabling a safe and timely transfer.

The effective use of databases for storing data is essential for short term reporting and management, and equally essential for generating useful long term data for process and business modelling.

What is critical when selecting vendors and what planning needs to go into a water system?

Choose a vendor or vendors that are:

* Familiar with the challenges outlined above.

* Able to provide a telemetry network that meets budget and technology requirements.

* Able to support connectivity to PLC and other devices.

* Able to supply a scada system that is built on and supports open standards such as OPC and has open interfaces – this will facilitate easy integration with third parties and allow easy customisation where necessary.

* Able to deploy specialists in the field of databases and reporting. A correctly designed database will ensure longevity and robustness as the database grows.

* Able to plan the system for user requirements and drive the design down to the level of field instrumentation.

* Able to include all aspects including laboratory systems and personnel.

If a system is planned well upfront the design and implementation should be relatively straightforward. Plan badly and the costs to change and modify will have an impact for years.



Credit(s)



Share this article:
Share via emailShare via LinkedInPrint this page

Further reading:

Why dedicated alarm management still has a role
Omniflex Remote Monitoring Specialists SCADA/HMI
Modern SCADA systems manage alarms more capably than ever, but dedicated alarm management and Sequence of Events technology still add value. Omniflex’s Ian Loudon explains how they help operators reconstruct incidents and turn alarm floods into actionable information.

Read more...
Smarter motor technology for high-performance industrial automation
Adroit Technologies Motion Control & Drives
Adroit Technologies is bringing Mitsubishi Electric’s EM-A series permanent magnet motors to Africa, offering servo-like speed and position control at a lower cost by combining patented sensorless control with the FR-E800 inverter to eliminate encoders while achieving IE5 efficiency.

Read more...
Software-defined automation is overcoming hardware interoperability limits
Schneider Electric South Africa SCADA/HMI
Schneider Electric’s Kobus Vermeulen and Sydney Higgo explain how open communication standards and software-defined architectures are enabling industrial operators to integrate legacy equipment, new control systems, and cloud platforms without disrupting operations.

Read more...
Cybersecurity must become part of the next era of industrial automation
Adroit Technologies IT in Manufacturing
The EU’s Cyber Resilience Act is setting a global benchmark for connected products, making cybersecurity a core engineering requirement in industrial automation. Adroit Technologies and Mitsubishi Electric explain how building security into controllers, PLCs and drives from the outset helps South African manufacturers protect production and meet international expectations.

Read more...
Siemens modernises WinCC Unified engineering
SCADA/HMI
Siemens has launched SIMATIC AX WinCC Unified Elements, an IT-style engineering application for the WinCC Unified system that lets automation engineers build and deploy visualisation projects using code-based workflows, Git integration and AI-generated configuration

Read more...
The control room used to run one plant, now it runs the world
SCADA/HMI
Industrial control rooms are evolving from single-site interfaces into network-wide command centres. Modern SCADA and HMI platforms now deliver real-time visibility, dynamic forecasting and cross-facility coordination, fundamentally reshaping how industrial operations achieve resilience.

Read more...
Effective alarm management for safer, more productive operations
Adroit Technologies SCADA/HMI
Adroit Technologies addresses alarm flooding and nuisance alarms with its Adroit Alarm Management solution.The platform combines performance dashboards, mobile escalation via Adroit AIR, and an integrated digital logbook to turn alarms into actionable operational intelligence.

Read more...
What you need is a nerve centre for your building
Schneider Electric South Africa SCADA/HMI
Schneider Electric’s Anoop Hariparsad explains how a building management system acts as a single nerve centre, cutting energy use and improving safety and guest experience.

Read more...
How a digital foundation can overcome the LNG trilemma
Schneider Electric South Africa IT in Manufacturing SCADA/HMI
The LNG sector is racing to add capacity, but without a digital backbone, growth creates complexity rather than capability. Christophe Begat of Schneider Electric explains how connecting data, systems and analytics across the LNG value chain can resolve the trilemma of secure supply, lower emissions and tighter costs.

Read more...
Building efficiency into cement production with SCADA and IIoT
Adroit Technologies Fieldbus & Industrial Networking
For decades, Adroit Technologies has worked alongside leading cement producers, helping them gain greater visibility into their operations through advanced SCADA and IIoT solutions.

Read more...









While every effort has been made to ensure the accuracy of the information contained herein, the publisher and its agents cannot be held responsible for any errors contained, or any loss incurred as a result. Articles published do not necessarily reflect the views of the publishers. The editor reserves the right to alter or cut copy. Articles submitted are deemed to have been cleared for publication. Advertisements and company contact details are published as provided by the advertiser. Technews Publishing (Pty) Ltd cannot be held responsible for the accuracy or veracity of supplied material.




© Technews Publishing (Pty) Ltd | All Rights Reserved